[1]
Liubov Lepska et al. 2025. Problems of using BIM in Variant Design of Reconstruction Processes in Underground Parts of Buildings and Structures Using Universal Machines . Metallurgical and Materials Engineering. 31, 4 (Apr. 2025), 655–663. DOI:https://doi.org/10.63278/1491.